North Esplanade
Currently in Design Phase
Project Information
The Project consists of widening and improving the Esplanade Corridor as a multi-modal, “Complete Streets” facility between Eaton Road to the northerly curb returns of the Leora Court/Nord Highway intersection (approximately 0.7 miles in length). The work will increase Esplanade from two to four lanes and includes bicycle, pedestrian, and transit improvements and a raised, landscaped, and irrigated median. Additional work includes installation of new curb, gutter, and 5-foot sidewalk in existing gaps; street lighting; dedicated left-turn pockets; full intersection improvements; driveway entrance improvements; traffic signal conduit; sewer lateral installation; and relocation or undergrounding or utilities.
Environmental
Contact Information
Noel Carvalho, Associate Engineer
Public Works-Engineering
411 Main Street, Second Floor
Chico, CA 95928
Tel: 530.879.6935
Email:
noel.carvalho@chicoca.gov