The 2024 Pavement Preservation Project consists of three locations in Chico that will primarily receive slurry seal treatment, along with some additional work. Please refer to each of the sections below for more information on the work to be completed at each location. This project is funded by Measure H.

Parkhurst Neighborhood:

For the Parkhurst Neighborhood location, a slurry seal treatment will occur throughout the neighborhood (see map below).  The neighborhood will also receive new striping within these limits.

Stilson Canyon:

A cape seal treatment will occur from Humboldt Road to the second cattle grate on Stilson Canyon Road. 

Upper Park Road:

For Upper Park Road, a cape seal treatment will occur from the limits of the Manzanita roundabout to Lot E in Upper Bidwell Park.  The separated bike path along Upper Park Road will also get a cape seal treatment. 

Map of Project Limits

Schedule

Construction is anticipated to begin Summer 2024.

Environmental

Environmental clearance will occur later in the design phase.