The 2023 Pavement Improvements Project consists of three locations in Chico that will primarily receive slurry seal treatment, along with some additional work. Please refer to each of the sections below for more information on the work to be completed at each location.

E. Lassen Avenue

For the E. Lassen Avenue location, a slurry seal treatment will occur along E. Lassen Avenue from San Jose Street (near the Esplanade) to Floral Avenue. A grind and inlay paving  treatment will occur along El Paso Way from E. Lassen Avenue to El Verano Way. Both streets will also receive new striping within these limits.

Image showing the project limits of E. Lassen Avenue as described above.

East Avenue

A slurry seal treatment will occur along East Avenue from Cohasset Road to the roundabout at Wildwood Park, and on all four legs of the intersection of East Avenue and Cohasset Road.

Image showing the project limits of East Avenue as described above.

Mulberry Neighborhood

A portion of the neighborhood south of Mulberry Street will receive a slurry seal treatment. The limits of this project include all the streets between Mulberry Street and Park Avenue that are also between E. 12th Street and E. 20th Street. 

Image showing the project limits of Mulberry Neighborhood as described above.

Environmental Clearance

The three locations in the 2023 Pavement Improvements project are exempt under two separate California Environmental Quality Act (CEQA) Notice of Exemption (NOE) documents.

E. Lassen Avenue & East Avenue

Notice of Exemption for 2023 Pavement Improvements

Mulberry Neighborhood

Notice of Exemption for 2022 Annual Road Rehabilitation

Contact Information

For more information regarding the 2023 Pavement Improvements Project, please contact the Public Works – Engineering Department at (530) 879-6900.

Log in