The project consisted of a complete, full depth reclamation (FDR) from Eastwood Avenue to 20th Street on Pine Street, Cypress Street, and Mulberry Street. Grind and overlay was completed from 9th Street to Eastwood on Pine and Cypress Streets. The eastern railing on Cypress Street bridge was also repaired as a part of this project.